Do You have the POC sheet? The Price Order Confirmation sheet. Look down the sheet bottom 1/4 on the left side. Where it says Order Type, Scheduling Priority, then Build Priority. If the Build Priority is 01 you will have a long wait. If the Build Priority says 99 you will have a short waiting time.
How do I know? I ordered a car that had a Build Priority of 01. That car took 9 months to get to the dealer.
The car I bought from a different dealer out of state had a Build Priority of 99. It was ordered on 3/8/09, Scheduled for build (D1) 3/16/09 7:33AM, At Facility 3/31/09 3:31AM, Built Pending Inspection (I) 3/31/09 2:23 Delivered to dealer 4/13/09
__________________
Chryslers of WI. www.club-cow.com
Mods. Done
Gas charged hood struts, 30% window tint
Full size spare tire
Daytime Running Lights turned on.
Silver Hood, Hockey Stick Stripes
Magnaflows exhaust, Fuzzy Dice
Zaino Show Car Polish, Functional Hood Scoops
Eibach Pro-System Plus Kit #2895.680
Script Challenger & R/T Emblems
Painted Engine Cover & Shock Tower Covers DWB
M&H RaceMasters DRs 275/45/18s
Boss 338 Wheels Black 18x8 front 18x9.5 rear
Competition/Plus Short Throw Shifter
|