Joined
·
860 Posts
There is about 10 bucks in material. The piece of steel,the metric flange bolt,2 bushings and some spray paint. I used a little body filler to smooth out the welds.Cannonball is correct... How much to make more??? I might be interested
I had it in my shop.It was left over some other project.you can get it at any hardware store. It's just 1 1/4" flat stock,1/4" thick.Where did you get the steel?
It's real easy to get it apart. It's way better then it was using the designed location.Clearance at the bottom looks tight. Is it hard to open it up and clean it out?